What we measure
Fit-out and MEP, item by item.
Everything below is measured from your drawings and schedules, in the units you'd use in a BOQ. Tick the groups you need when you upload.
Fit-out
Architectural interior works, measured from layout, reflected ceiling, finishes and joinery drawings.
Ceilings
| Item | Unit | How it is broken down |
|---|---|---|
| Gypsum board ceilings | m² | By board type: standard, moisture resistant, fire rated |
| Tile ceilings | m² | Mineral fibre, metal or acoustic, by tile size |
| Bulkheads and drops | m | By height of drop |
| Cornices and shadow gaps | m | By profile |
| Access panels | nos | By size |
Partitions and walls
| Item | Unit | How it is broken down |
|---|---|---|
| Gypsum partitions | m² | By system, thickness and height; openings deducted |
| Glass partitions | m | Frameless or framed, with height noted |
| Blockwork | m² | By block thickness |
| Wall cladding and panelling | m² | By material |
Floor and wall finishes
| Item | Unit | How it is broken down |
|---|---|---|
| Floor finishes | m² | Porcelain, marble, carpet, vinyl, raised floor, screed |
| Skirting | m | By material and height |
| Thresholds | nos | At finish changes and door openings |
| Wall finishes | m² | Paint, wallpaper, wall tiles, by height |
Doors and joinery
| Item | Unit | How it is broken down |
|---|---|---|
| Doors | nos | By type, size and fire rating, from the door schedule |
| Ironmongery sets | sets | Grouped by door type |
| Joinery items | nos / m | Counters, wardrobes, vanity units, shelving |
| Signage | nos | Room and wayfinding signs |
MEP
Building services measured from layout drawings, legends and schedules, sorted by system and size.
HVAC
| Item | Unit | How it is broken down |
|---|---|---|
| Ductwork | m / m² | By size; sheet area calculated per section |
| Diffusers and grilles | nos | Supply, return, exhaust, by size |
| Indoor units and fans | nos | FCU, AHU, split units, exhaust fans |
| Refrigerant and drain pipe | m | By diameter |
| Duct insulation | m² | By thickness |
Plumbing and drainage
| Item | Unit | How it is broken down |
|---|---|---|
| Water supply pipe | m | By material and diameter |
| Drainage pipe | m | By diameter |
| Sanitary fixtures | nos | WC, basin, sink, shower, urinal |
| Floor drains and cleanouts | nos | By size |
| Valves | nos | By type and diameter |
Electrical
| Item | Unit | How it is broken down |
|---|---|---|
| Light fittings | nos | By fitting type from the lighting legend |
| Sockets and switches | nos | By type and gang |
| Distribution boards | nos | By board reference |
| Cable tray and trunking | m | By width |
| Conduit | m | By diameter, where routes are drawn |
Fire fighting and alarm
| Item | Unit | How it is broken down |
|---|---|---|
| Sprinkler heads | nos | Pendent, upright, sidewall |
| Fire fighting pipe | m | By diameter |
| Detectors | nos | Smoke, heat, multi-sensor |
| Call points and sounders | nos | By type |
| Hose reels and extinguishers | nos | By type |
Low current
| Item | Unit | How it is broken down |
|---|---|---|
| Data and phone outlets | nos | By outlet type |
| CCTV cameras | nos | By camera type |
| Access control | nos | Readers, locks, exit buttons |
| Wi-Fi access points | nos | From the layout |
Not included
So there are no surprises when the quantity sheet arrives.
- Pricing or rates
- Structural, civil and external works
- Revit models (coming later)
- Design checks or value engineering
- Site measurement
Have drawings ready?
Upload them now. We check every sheet and confirm the scope and delivery time within 2 working hours, before any work starts.